Articles | Volume 11, issue 2
Drink. Water Eng. Sci., 11, 87–100, 2018
https://doi.org/10.5194/dwes-11-87-2018
Drink. Water Eng. Sci., 11, 87–100, 2018
https://doi.org/10.5194/dwes-11-87-2018

Research article 30 Jul 2018

Research article | 30 Jul 2018

Comprehensive analysis of the start-up period of a full-scale drinking water biofilter provides guidance for optimization

Loren Ramsay et al.

Viewed

Total article views: 5,882 (including HTML, PDF, and XML)
HTML PDF XML Total BibTeX EndNote
5,131 697 54 5,882 47 44
  • HTML: 5,131
  • PDF: 697
  • XML: 54
  • Total: 5,882
  • BibTeX: 47
  • EndNote: 44
Views and downloads (calculated since 23 Mar 2018)
Cumulative views and downloads (calculated since 23 Mar 2018)

Viewed (geographical distribution)

Total article views: 4,627 (including HTML, PDF, and XML) Thereof 4,460 with geography defined and 167 with unknown origin.
Country # Views %
  • 1
1
 
 
 
 

Cited

Latest update: 23 Jan 2022
Download
Short summary
Many waterworks utilize sand filters that rely on microorganisms for water treatment. When new, these biofilters require several months for the growth of microorganisms before they become functional. This study is the most thorough documentation of this start-up process to date. Results show that the onset of removal of individual substances proceeds in a well-defined order and that the different filter depths have different functions, suggesting which activities may shorten the start-up period.